Emergency & outages: (264) 497-2891

About ANGLEC

Bringing power to every corner of Anguilla

From a small Valley network to an island-wide grid.

The public supply of electricity in Anguilla is relatively new. Before 1975, the level of electrification on the island was limited to The Valley area. The Valley network consisted of a small medium voltage system which supplied businesses and residents within a mere 500 metre radius of the Valley Power Station.

In 1975, the high voltage network was introduced, with the intention of electrifying the entire island. By 1989, electricity was made available to almost all residences and businesses. Since 1986, electricity consumption has increased at a rapid rate — driven by new connections and the growth of the tourist industry, with hotels, restaurants and construction bolstering consumption.

Anglec’s Generation Department consists of an operations staff responsible for ensuring that the demand for electricity is met and tracking the performance of the generating units, and a maintenance staff responsible for keeping the generating units in top operating condition.

While generating capacity may seem large compared to peak demand, not all units are available at all times. Routine maintenance and major overhauls, as well as unexpected mechanical equipment failure, can reduce available generating capacity.

At the end of 2008, units generated were 89,501,193 kWh compared to 88,998,923 kWh in 2007.

1975

High voltage network introduced

1989

Near island-wide electrification

11

Generating units in operation

28 MW+

Capacity after the 5.4 MW set

  1. Before 1975

    Electrification limited to The Valley — a small medium voltage system within 500 m of the Valley Power Station.

  2. 1975

    High voltage network introduced to electrify the entire island.

  3. 1989

    Electricity available to almost all residences and businesses.

  4. 2007

    Order placed for an additional 5.4 MW generating set based on expected load growth.

  5. 1 Feb 2009

    New generating set arrives in Anguilla, raising capacity to more than 28 MW.